C1C28 INSTALL GUIDE
Model No. Gas Supply BTU's Regulator WC Pressure Max PSI Electrical Requirements
2 4
/2"
" 2
2 4
2
4" 2
2 2"
2 23" 2"
2 "
2 23"
Cutout Dimensions for Island
Overall Product Dimensions
When using a Coyote insulated jacket, you will want to build your island to the jackets Cutout and Overall Dimensions
listed above (detailed on 2nd page). Once the jacket is installed, the grill will rest on/inside the insulated jacket
2/4"
2/2"
2/2" /4"
"
3/" 22/"
Important Note to Installer: This file is ns specific safety not intended to replace your Owners' Manual which contai
requirements and consumer guidelines. Please refer to your Owners' Manual prior to installing or operating your built-in grill.
"
23"
2/4"
"
3/"
22/"
FRONT VIEW
TOP VIEW
REAR VIEW
SIDE VIEW

www.coyoteoutdoor.com
C1C28
C1C28
C1C28
C1C28C1C28
INSTALL GUIDE
INSTALL GUIDE
INSTALL GUIDE
INSTALL GUIDEINSTALL GUIDE
10 1/ "4
OPENING
HEIGHT
DOORS / DRAWERS
OPENING WIDTH
20 1/ "2
OPENING
DEPTH
OPENING
HEIGHT
GRILL
OPENING
GRILL
OVERHANG
TOP VIEW
25"
OPENING WIDTH
2 1/ "2
OPENING
HEIGHT
DOORS / DRAWERS
OPENING WIDTH
OPENING
DEPTH
OPENING
HEIGHT
24"
LINER
OPENING
7/ "8
JACKET
OVERHANG
TOP VIEW
OPENING WIDTH
24"
NON-COMBUSTIBLE CONSTRUCTION
NON-COMBUSTIBLE CONSTRUCTION
NON-COMBUSTIBLE CONSTRUCTION
NON-COMBUSTIBLE CONSTRUCTIONNON-COMBUSTIBLE CONSTRUCTION
Insulated Jacket NOT Required
Insulated Jacket NOT Required
Insulated Jacket NOT Required
Insulated Jacket NOT RequiredInsulated Jacket NOT Required
FRONT VIEW FRONT VIEW
1 1/ " 2 MIN
INCLUDING
COUNTERTOP
Combustible material can not be within 24" of the grills frame
This applies to all directions - horizontal & vertical
Shaded area above on "TOP VIEW" illustrates the 24" minimum
requirement (not to scale for rendering purposes)
The grill is designed to hang from the counter top with no support
underneath
Minimum rear clearance for the hood to open is 2"
If you have a wall/partition behind the grill, the minimum rear clearance
to that wall should be at least 7" to allow for ventilation of the exhaust
24"
If using combustible material within 24" of the grill frame, you MUST
use the corresponding Coyote Insulated Jacket
Using a insulated jacket, does not waive any other standard installation
procedure (ventilation, connections, etc)
The jacket is designed to hang from the counter top with no support
underneath
Minimum clearance for hood to open is 2"
If you have a wall/partition behind the grill, the minimum rear clearance
to that wall should be at least 7" to allow for ventilation of the exhaust
Ventilation Requirements:
Ventilation Requirements:
Ventilation Requirements:
Ventilation Requirements:Ventilation Requirements:
Regardless if you are using a combustible or non-combustible building material, you must include at least two vents within
the island.
These vents must be at least 20 sq. in. each and allow fresh air to move from the grill cabinet to the exterior environment.
For a propane setup, the vents should be installed lower as propane is heavier than air.
For a natural gas setup, the vents should be located higher in the island, as natural gas is lighter than air.
Do not locate the two vents on the same wall of the island. Cross ventilation is key to allow any excess heat or trapped
gas to dissipate.
1 1/ "2
1 5/ "8
1 1/ "2221/ "8
1 1/ " 2 MIN
COMBUSTIBLE CONSTRUCTION
COMBUSTIBLE CONSTRUCTION
COMBUSTIBLE CONSTRUCTION
COMBUSTIBLE CONSTRUCTIONCOMBUSTIBLE CONSTRUCTION
Insulated Jacket Required - Model # CJAKTCC2
Insulated Jacket Required - Model # CJAKTCC2
Insulated Jacket Required - Model # CJAKTCC2
Insulated Jacket Required - Model # CJAKTCC2Insulated Jacket Required - Model # CJAKTCC2
7/ "8
11"
INCLUDING
COUNTERTOP
28 1/ "4
1 3/ "4
2 1/ "2
2
1/ "2
2"
G
G
G
GG
GAS
CONNECTION
G
G
G
GG
4 1/ "8
4 1/ " 8G
G
G
GG
GAS
CONNECTION
4 1/ "8
2 3/ "4
Important
Important
Important
ImportantImportant Note
Note
Note
NoteNote to
to
to
toto Installer:
Installer:
Installer:
Installer:Installer:
This file is not intended to replace your Owners' Manual which contains specific safety
requirements and consumer guidelines. Please refer to your Owners' Manual prior to installing or operating your built-in grill.
Specyfikacje produktu
Marka: | Coyote |
Kategoria: | Rożen |
Model: | CCD-2DC |
Potrzebujesz pomocy?
Jeśli potrzebujesz pomocy z Coyote CCD-2DC, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą
Instrukcje Rożen Coyote
12 Września 2024
11 Września 2024
6 Września 2024
6 Września 2024
5 Września 2024
4 Września 2024
3 Września 2024
2 Września 2024
2 Września 2024
2 Września 2024
Instrukcje Rożen
- Rożen Cuisinart
- Rożen Adler
- Rożen Weasy
- Rożen Dacor
- Rożen Ambiano
- Rożen Jumbuck
- Rożen Matador
- Rożen Tefal
- Rożen Louisiana Grills
- Rożen Masterbuilt
- Rożen DeLonghi
- Rożen Masport
- Rożen Smeg
- Rożen Buffalo
- Rożen Guzzanti
Najnowsze instrukcje dla Rożen
9 Kwietnia 2025
9 Kwietnia 2025
5 Kwietnia 2025
1 Kwietnia 2025
1 Kwietnia 2025
1 Kwietnia 2025
29 Marca 2025
27 Marca 2025
12 Marca 2025
4 Marca 2025