Instrukcja obsługi LevelOne GTL-5291
LevelOne
przełącznik
GTL-5291
Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla LevelOne GTL-5291 (24 stron) w kategorii przełącznik. Ta instrukcja była pomocna dla 9 osób i została oceniona przez 5 użytkowników na średnio 4.7 gwiazdek
Strona 1/24

Quick Installation Guide
( ) Managed Commercial Grade Switches

- 1 -
Content
English .........................................................................................................2
Deutsch...............................................................................................................
5
Français ..................................................................................................... 9 ..
Español ............ .....................1..................................................................... 2
Italiano .............................................................................................................
16
Português ........................................................................................................
20
This Quick Installation Guide only describes the most basic situations and
settings. All detailed information is described in the user manual.

- 2 -
English
Package Contents
This product is provided with the following accessories in the box; please check them carefully. If
any of the accessories is missing or damaged, please contact with your local dealer timely.
Serial number
Name
Quantity
Note
1
Master unit
1
Required
2
Power cord
1
Required
3
Quick Installation Guide
1
Required
4
Declaration of Conformity
1
Required
5
L-shaped bracket and other
1
Required
Preparing for installation
For smooth installation, please prepare the following items:
l Installation tools, including: Phillips screwdriver, static wrist anti strap,etc.
l Connecting cables, such as network cable, optical fiber, optical fiber module, etc.
l Related devices, such as electrical outlets, HUB, switch, router,etc.
The installation environment for the switch must meet the following requirements:
l The switch must avoid direct sunlight, away from heat and sources of strong electromagneticinterference.
l The switch must be placed in a cool, dry place, and there should be enough gap for heat dissipation all
around for the purpose of ventilation and heat dissipation.
l -1 0 1 0The switch must work in the indoor environment with a temperature of 0 °C~5 °C and humidityof 0%~9 %
without condensation.
Equipment Installation
1. I nstalled in the rack
Install the switch on a 19-inch standard rack, and the installation steps are as follows:
l
Check the grounding and stability of the rack;
l
Install the two L-shaped brackets accessories in the on both of sides the switch panel, and fix
them with the screws in the accessories;
l
Place the switch in of the appropriate location the rack, and support itusing a tray;
l
Secure the L-shaped brackets guide on the slots fixed the rack, at both ends of to thatensure the
switch can mounted be on the rack in astable, horizontal manner;
l
Use a power cord power connector with to connect the switch the powersocket.
Specyfikacje produktu
Marka: | LevelOne |
Kategoria: | przełącznik |
Model: | GTL-5291 |
Potrzebujesz pomocy?
Jeśli potrzebujesz pomocy z LevelOne GTL-5291, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą
Instrukcje przełącznik LevelOne
9 Stycznia 2025
9 Stycznia 2025
9 Stycznia 2025
30 Grudnia 2025
30 Grudnia 2025
30 Grudnia 2025
4 Grudnia 2024
9 Października 2024
4 Października 2024
2 Października 2024
Instrukcje przełącznik
- przełącznik Flamingo
- przełącznik Ecler
- przełącznik Marmitek
- przełącznik StarTech.com
- przełącznik Profile
- przełącznik Elektrobock
- przełącznik Emerson
- przełącznik GEV
- przełącznik SIIG
- przełącznik IFM
- przełącznik Ei Electronics
- przełącznik Metra
- przełącznik Juniper
- przełącznik Huawei
- przełącznik DoorBird
Najnowsze instrukcje dla przełącznik
9 Kwietnia 2025
9 Kwietnia 2025
7 Kwietnia 2025
5 Kwietnia 2025
4 Kwietnia 2025
4 Kwietnia 2025
4 Kwietnia 2025
3 Kwietnia 2025
3 Kwietnia 2025
2 Kwietnia 2025