Instrukcja obs艂ugi Zempire Zeus
Przeczytaj poni偶ej 馃摉 instrukcj臋 obs艂ugi w j臋zyku polskim dla Zempire Zeus (2 stron) w kategorii namiot. Ta instrukcja by艂a pomocna dla 16 os贸b i zosta艂a oceniona przez 8.5 u偶ytkownik贸w na 艣rednio 4.7 gwiazdek
Strona 1/2

PITCHING INSTRUCTIONS - ZEUS
2. Assemble the pole section. Ensure
the poles are inserted firmly together.
If the ferrules do not connect
together correctly they can cause
damage when tensioned.
8. Peg out all peg points and
guys ropes, pegging at a 45o
angle
7. Connect the fly to the inner by
connecting the Side Release
buckles at the end of each pole
line.
3. Insert the pole ends in to the
eyelets found at each corner of the
inner. The pole sections should RED
be inserted into the webbings. RED
Also insert the ends of each brow
pole into the eyelets found above
each door.
1. Clear your site making sure there are no
sharp objects. Try to get a site that is as flat
as possible. Stretch out the inner tent.
1x
6. Throw the flysheet over
the inner and fasten the
Velcro ties found on the
inside of the fly around the
pole lines.
4. Connect the inner to the frame
by connecting the c clips the run
along each seam.
5. Peg out the inner tent. Try to
tension the floor so that it sits flat.
Specyfikacje produktu
| Marka: | Zempire |
| Kategoria: | namiot |
| Model: | Zeus |
Potrzebujesz pomocy?
Je艣li potrzebujesz pomocy z Zempire Zeus, zadaj pytanie poni偶ej, a inni u偶ytkownicy Ci odpowiedz膮
Instrukcje namiot Zempire
25 Stycznia 2025
23 Wrze艣nia 2024
23 Wrze艣nia 2024
23 Wrze艣nia 2024
22 Wrze艣nia 2024
22 Wrze艣nia 2024
22 Wrze艣nia 2024
22 Wrze艣nia 2024
22 Wrze艣nia 2024
22 Wrze艣nia 2024
Instrukcje namiot
- Vrijbuiter
- Isabella
- Obelink
- OZtrail
- Mx Onda
- DWT
- Outdoor Connection
- Edges
- Ventura
- Aart Kok
- McKinley
- Black Wolf
- Walker
- Nigor
- Philips
Najnowsze instrukcje dla namiot
31 Marca 2025
30 Marca 2025
29 Marca 2025
29 Marca 2025
29 Marca 2025
29 Marca 2025
29 Marca 2025
29 Marca 2025
29 Marca 2025
28 Marca 2025