Instrukcja obsługi APC RBC22
Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla APC RBC22 (2 stron) w kategorii UPS. Ta instrukcja była pomocna dla 8 osób i została oceniona przez 4.5 użytkowników na średnio 4.6 gwiazdek
                        Strona 1/2
                    
                    
                    
990-0374A    revision 2   11/01
This a dendum does not apply to Ba k-UPS P o 1000/1400 and Smart-UPS V/S 1000/1400d c r  
I.Installation
Follow the installation illustration on the accompanying sheet.
Note: Small sparks at the battery connectors are normal during connection.
II. Post-Installation
Once installed, 
allow the unit to charge for five hours. If the unit is an XL model, allow it to charge for
24 hours.
Note: The Smart-UPS will charge whether it is on or off, and will charge whether there is a load
present or not. In situations where the power quality is poor, it is recommended that the unit be
shutdown during this charging period. A Smart-UPS that is powered on may switch to battery
operation which would prolong the time needed to fully recharge the battery.
III.  Clearing the Replace Battery LED
A. In order for the replace battery LED  validto be cleared, it is necessary to run a   self test. For a self test
to be considered valid, the following conditions must be satisfied:
■battery capacity must be greater than 75%(minimum of four battery bar graph LEDs illuminated)
or
■Smart-UPS must have been charging for at least 8 hours from the last low battery condition. (Low
battery condition refers to a state when the Smart-UPS battery has fully discharged).
B. Ways to initiate a self test
A self test can be initiated in any one of five ways:
■Start up of the UPS
■Smart-UPS front panel test button
■Powerchute PLUS software
■SmartSlot Accessory
■Automatic timer- every two weeks from turn on    (see APC owners manuals for details)
IV.   Verifying Operation
A. What happens during a self test?
When a self test is initiated, the unit supports the load while operating on battery for approximately
8-10 seconds. During this period, the Smart-UPS determines the health of the battery.
B. When should the self test be performed?
After the unit has charged for five hours, a self test can be performed.
Replacement Battery Cartridge(RBC) Addendum
RBC5, RBC6, RBC7, RBC8, RBC9, RBC11, RBC12, RBC22, RBC23, RBC24, RBC25,
RBC27, RBC28, RBC5I, RBC6I, RBC7I, RBC8I, RBC9I, RBC11I, RBC12I, RBC22I,
RBC23I, RBC24I, RBC25I, RBC5J, RBC6J, RBC7J, RBC8J, RBC11J, RBC12J,
Specyfikacje produktu
| Marka: | APC | 
| Kategoria: | UPS | 
| Model: | RBC22 | 
Potrzebujesz pomocy?
Jeśli potrzebujesz pomocy z APC RBC22, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą
Instrukcje UPS APC
                        
                         2 Kwietnia 2025
                        
                    
                                                            
                        
                         2 Kwietnia 2025
                        
                    
                                                            
                        
                         30 Marca 2025
                        
                    
                                                            
                        
                         29 Marca 2025
                        
                    
                                                            
                        
                         29 Marca 2025
                        
                    
                                                            
                        
                         29 Marca 2025
                        
                    
                                                            
                        
                         29 Marca 2025
                        
                    
                                                            
                        
                         29 Marca 2025
                        
                    
                                                            
                        
                         27 Marca 2025
                        
                    
                                                            
                        
                         27 Marca 2025
                        
                    
                                                            Instrukcje UPS
- LevelOne
- Bxterra
- Salicru
- Approx
- LC-Power
- Teltonika
- Ikea
- PowerWalker
- Emerson
- Tripp Lite
- V7
- Lenovo
- FSP/Fortron
- Dell
- Gembird
Najnowsze instrukcje dla UPS
                        
                         29 Marca 2025
                        
                    
                                                            
                        
                         5 Marca 2025
                        
                    
                                                            
                        
                         5 Marca 2025
                        
                    
                                                            
                        
                         30 Stycznia 2025
                        
                    
                                                            
                        
                         28 Stycznia 2025
                        
                    
                                                            
                        
                         28 Stycznia 2025
                        
                    
                                                            
                        
                         28 Stycznia 2025
                        
                    
                                                            
                        
                         28 Stycznia 2025
                        
                    
                                                            
                        
                         28 Stycznia 2025
                        
                    
                                                            
                        
                         27 Stycznia 2025