Instrukcja obsługi CyberPower CyberShield CSN30C12V-E
                    CyberPower
                    
                    UPS
                    
                    CyberShield CSN30C12V-E
                
                                
    Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla CyberPower CyberShield CSN30C12V-E (2 stron) w kategorii UPS. Ta instrukcja była pomocna dla 17 osób i została oceniona przez 9 użytkowników na średnio 4.7 gwiazdek
                        Strona 1/2
                    
                    
                    
User’s Manual for
CyberShield
CSN30C12V-E
IMPORTANT SAFETY WARNINGS 
(SAVE THESE INSTRUCTIONS)
This manual contains important instructions regarding the installation and operation of this device.
Read this manual thoroughly before attempting to unpack , install or operate this device 
CAUTION!
CAUTION!
INSTALLATION 
BATTERY REPLACEMENT
This battery is hot-swappable. As long as utility power is on , you may leave the Battery Backup 
Power Supply and connected equipment on while replacing a new battery.
Step 1: 
a. Remove the case screw.
b. Open the battery cover.
Step 2: 
a. Loosen strap from battery.
b. Slide battery off of the shelf.
c. Remove battery cable connector.
Step 1: 
a. Remove the case screw.
b. Open the battery cover.
Step 2: 
a. Loosen the battery strap.
b. Disconnect battery cable connector
    to remove battery.
c. Replace with new battery and
    reconnect the battery connector.
Step 3: 
a. Tighten the battery strap.
b. Close the battery cover and 
    lock the case screw.
CAUTION! Power Cable Selection:
A power cable (4.5m max.) being identified as 18AWG, "OUTDOOR" or "WATERPROOF"
should be selected while necessary.
CAUTION!
The battery can energize hazardous live parts inside even when the AC input power is
disconnected. 
To reduce the risk of electric shock, keep the cover on. there are no user serviceable 
parts inside the unit, including the battery. Please contact us or our dealer for service.
When replacing batteries, the replacement should have the same rating: 
Listed/Certified Valve Regulated Lead Acid Battery, 12V, max. 9Ah.
CAUTION! Before replacing batteries, remove conductive jewelry, such as chains, watches and rings, 
and use tools with insulated handles. High energy passed through conductive materials 
can cause severe burns.
CAUTION!  Don’t dispose of batteries in a fire. Batteries may explode if improperly disposed. 
Recycle batteries in accordance with local regulations.
The UPS battery is charging when it’s connected to utility power. The battery is charging 
during its first 24 hours of normal operation. Don’t expect full battery capacity during this 
initial charging period.
CAUTION! 
Step 3: 
a. Use the enclosed installation template to mark an installation location for the unit.
    b. The unit can only be wall-mounted in one direction with the connector facing down. 
d. Tighten the screws to secure the unit.
e. Reconnect the battery cable connector and place the battery back.
CAUTION! Keep the gap around the UPS for air circulation.
CyberShield UPSs are designed to provide a local power solution for 
cable telephony, wireless local loop (WLL), and fiber to the home
(FTTH) broadband equipment. 
c. Mount the unit on the wall with 3 mounting screws into the keyhole slots.
13/32”
3/16”
Runtimes based on testing fully-charged, new batteries at normal operating conditions.
Runtime curve is approximate and varies based on battery age, level of charge at test, 
environment, and other variables.
CAUTION!
OPERATION
Please refer to the following recommendations to connect equipment and power source.
Step3. Plug the UPS power cord into the utility power cord inlet.
Step4. Plug the UPS power cord into the wall outlet.
Step2. Refer to the   to setup the connector and connect equipmentCOMMUNICATION SIGNALS
Step1. Refer to the   to connect the battery. BATTERY REPLACEMENT
to the UPS.
To avoid electric shock, unplug power cable from the AC power source before servicing 
the battery or installing a computer component.
CAUTION!
COMMUNICATION SIGNALS
The communication signals of this unit are isolated from the internal circuitry via open collector opto-
coupled transistors. The connection “SIG RTN” (Signal Return) is a common return point for all 
communication signals. In the typical application, the attached equipment digital ground connects to 
Signal Return, and pull-up resistors turn the open collector signals into logic levels.
12V
12V RTN
SIG RTN
ON BATTERY
REPLACE BATTERY 
BATTERY MISSING 
LOW BATTERY
+ Voltage output
- Voltage output
Signal return
Low when operating from utility line. 
Open when operating from battery.
Low when battery is charged. 
Open when battery fails the Self Test.
Low when battery is present. 
Open when battery is missing.
Low when battery is near full charge capacity.
Open when operating from a battery with < 10% capacity.
Utility power cord inlet
Communication signals
MessageSignal
It is recommended to connect the unit to the required equipment and battery before 
plugging in the utility power.
CAUTION!
Specyfikacje produktu
| Marka: | CyberPower | 
| Kategoria: | UPS | 
| Model: | CyberShield CSN30C12V-E | 
Potrzebujesz pomocy?
Jeśli potrzebujesz pomocy z CyberPower CyberShield CSN30C12V-E, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą
Instrukcje UPS CyberPower
                        
                         28 Stycznia 2025
                        
                    
                                                            
                        
                         28 Stycznia 2025
                        
                    
                                                            
                        
                         28 Stycznia 2025
                        
                    
                                                            
                        
                         28 Stycznia 2025
                        
                    
                                                            
                        
                         27 Stycznia 2025
                        
                    
                                                            
                        
                         27 Stycznia 2025
                        
                    
                                                            
                        
                         15 Stycznia 2025
                        
                    
                                                            
                        
                         3 Stycznia 2025
                        
                    
                                                            
                        
                         3 Stycznia 2025
                        
                    
                                                            
                        
                         30 Grudnia 2025
                        
                    
                                                            Instrukcje UPS
- Steren
- Bxterra
- Atlantis Land
- Vanson
- Puls Dimension
- Liebert
- APC
- V7
- Minute Man
- Lenovo
- Altronix
- Ikea
- Middle Atlantic
- Salicru
- Energenie
Najnowsze instrukcje dla UPS
                        
                         2 Kwietnia 2025
                        
                    
                                                            
                        
                         2 Kwietnia 2025
                        
                    
                                                            
                        
                         30 Marca 2025
                        
                    
                                                            
                        
                         29 Marca 2025
                        
                    
                                                            
                        
                         29 Marca 2025
                        
                    
                                                            
                        
                         29 Marca 2025
                        
                    
                                                            
                        
                         29 Marca 2025
                        
                    
                                                            
                        
                         29 Marca 2025
                        
                    
                                                            
                        
                         29 Marca 2025
                        
                    
                                                            
                        
                         27 Marca 2025