Instrukcja obsługi Dormakaba HSW-R
Dormakaba
nieskategoryzowany
HSW-R
Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Dormakaba HSW-R (15 stron) w kategorii nieskategoryzowany. Ta instrukcja była pomocna dla 16 osób i została oceniona przez 8.5 użytkowników na średnio 3.6 gwiazdek
Strona 1/15

HSW-R Installation Instructions
Track rail 72 x 75 mm
1. Ceiling substructure for track rail and installation of the track rail:
The track rail must be bolted over its entire length (including the stacking track area) to a correctly
aligned, longitudinally and transversely horizontal substructure (e.g. DORMA „UK“ substructure system).
The substructure should be designed to accommodate the total weight of all the panels both in the
stacking area and in the partition section.
The fixing point intervals for mounting the track rail to the substructure should be approx. 300 mm
along the straight sections and approx. 100 mm in the stacking area.
Caution: All the track joints must be provided with connection pins (a) in order to ensure a flush
transition between the track sections and thus smooth sliding panel operation. (Fig. 1)
a
DORMA-Glas 800.52.127.6.32 Stand/Issue 05/04 Seite/Page 1/15
Fig. 1
2. Preparing the floor (Fig. 2):
In the standard version, eccentric sockets are recessed into the floor as lock keeps.
A Drill hole 25 mm dia. 30 mm deep for eccentric sockets, plus 8 mm dia. hole for anchor plug. Align
eccentric socket (double eccentric) and tighten with centre screw.
B Insert eccentric socket in recessed channel section

a
b
30
ø 25
S8
DORMA-Glas 800.52.127.6.32 Stand/Issue 05/04 Seite/Page 2/15
Fig. 2
3. Installing the floor springs (Fig. 3):
A recess (see drawing) must be provided for the floor springs (DORMA BTS). This is eventually covered
with a stainless steel floor plate.
a) Recess for the double action end panel floor spring
b) Recess for the double action sliding panel floor spring
20
57
57
a
b
BTS 75 = 51-57
BTS 80 = 51-57
BTS 84 = 51-58
BTS 75 = 291
BTS 80 = 341
BTS 84 = 306
BTS 75 = 50
BTS 80 = 60
BTS 84 = 40
BTS 75 = 50
BTS 80 = 60
BTS 84 = 40
BTS 75 = 51-57
BTS 80 = 51-57
BTS 84 = 51-58 BTS 75 = 291
BTS 80 = 341
BTS 84 = 306
BTS 75 = 78
BTS 80 = 78
BTS 84 = 108
BTS 75 = 78
BTS 80 = 78
BTS 84 = 108
Fig. 3

DORMA-Glas 800.52.127.6.32 Stand/Issue 05/04 Seite/Page 3/15
Fig. 4
5. Track roller arrangement (Fig. 5):
Only one roller type is provided for all the panels. The arrangement of the guide rollers in the stacking
area inlet section is of critical importance.
A Roller block for straight-through section = high guide rollers (a) outside
B Roller block for entry into branch section = high guide rollers (a) inside
a
A B
a
Fig. 5
4. Glazing (Fig.4):
The aluminium frame is supplied ready assembled and surface treated.
In performing the glazing work, ensure compliance with the instructions and guidelines of the double
glazing manufacturer.
Specyfikacje produktu
Marka: | Dormakaba |
Kategoria: | nieskategoryzowany |
Model: | HSW-R |
Potrzebujesz pomocy?
Jeśli potrzebujesz pomocy z Dormakaba HSW-R, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą
Instrukcje nieskategoryzowany Dormakaba
31 Sierpnia 2024
31 Sierpnia 2024
31 Sierpnia 2024
31 Sierpnia 2024
31 Sierpnia 2024
31 Sierpnia 2024
31 Sierpnia 2024
31 Sierpnia 2024
31 Sierpnia 2024
31 Sierpnia 2024
Instrukcje nieskategoryzowany
- nieskategoryzowany Ketron
- nieskategoryzowany Proline
- nieskategoryzowany IPGARD
- nieskategoryzowany DeepCool
- nieskategoryzowany Healthy Choice
- nieskategoryzowany Emerson
- nieskategoryzowany REVO
- nieskategoryzowany Bavaria
- nieskategoryzowany Ferplast
- nieskategoryzowany Monzana
- nieskategoryzowany Fontastic
- nieskategoryzowany Kopul
- nieskategoryzowany Hotpoint
- nieskategoryzowany Rapoo
- nieskategoryzowany Max Pro
Najnowsze instrukcje dla nieskategoryzowany
28 Października 2024
28 Października 2024
27 Października 2024
27 Października 2024
27 Października 2024
27 Października 2024
27 Października 2024
27 Października 2024
27 Października 2024
27 Października 2024