Instrukcja obsługi Growatt ARK 5.12~25.6XH-A1
Growatt
Akumulator
ARK 5.12~25.6XH-A1
Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Growatt ARK 5.12~25.6XH-A1 (3 stron) w kategorii Akumulator. Ta instrukcja była pomocna dla 14 osób i została oceniona przez 7.5 użytkowników na średnio 4.4 gwiazdek
Strona 1/3

System size
BDC95045-A1
ARK 2.5H-A1
Note: Press the position indicated in the figure above before disconnecting the power terminal.
6.Terminal Connection
Power terminal
6-1
ARK 5.12~25.6XH-A1
Quick Installation Manual
Installation environment
Max.+ ℃50 Min.- ℃10 RH.+ %~+ %5 95
Installation tools
1.Check
Check ARK 2.5H-A1 List
1-2
ARK 2.5H-A1 1 Serial cable 1
Check BDC 95045-A1 List
1- 1
Diagram of wiring connection
5-3
Note: It is not recommended to install a DC circuit breaker between the battery system and the hybird inverter system,
If you want to install a DC circuit breaker with rated working voltage grearer than 1000V and rated working current greater
than 63A, do not operate the DC circuit breaker with power on, otherwise the machine may be damaged.
1
8.Key operation
Power Button
Situation
System of f
Touch
Press 5S(≥ )
Definition
Power on
Press
Note: When multiple battery syetem are used in parallel connection, you only need to press one key of any module to start the system.
9.Service and contact
Shenzhen Growatt New Energy Co., Ltd
4-13/F,Building A,Sino-German(Europe) Industrial Park,
Hangcheng Ave,Bao’an District, Shenzhen, China
86 0755 2747 1942 service@ginverter.com
W:www.ginverter.com
Growatt New Energy
6
Power ON battery system Power OFF battery system
7.Battery system switch operation
ARK 2.5H-A1 Connection end face introduction
5-2
12 3 456 7
To PCS To PCS
Insert Plug
Insert Plug
ARK 2.5H-A1 Series cable
ARK XH Battery Cable
Battery+Battery-Rs485 PERs485 Battery- Battery+ PE
1
LINK0 Series
Communication Port
5
GND terminal
2
LINK1 Series
Communication Port
6
Safety vent
3
Module negative
terminal
7
GND terminal
4
Module positive terminal
Power on battery system:
Turn the circuit breaker to the "ON" state, press the
POWER button for 5-6 seconds, wait for the battery
system LED light to light up, indicating that the boot
is complete.
Power off battery system:
Turn the breaker of to "OFF" to turn off the entire battery
system.
BDC 95045-A1
Communication line B
Connector A
SYS COM “1" to “W-”
SYS COM “2" to “W+”
SYS COM “7" to “B”
SYS COM “8" to “A”
*
*
*
*
***
* *
Communication port connection
5-4
5
BDC 95045-A1
MOD TL3-XH
Silk screen
Terminal serial number
Definition
Silk screen
Terminal serial number
Definition
INV
1
WAKE-(W-)
COM
10
BAT.EN-
2
WAKE+(W+)
9
BAT.EN+
7
RS 485_B (B)
8
RS485B2
8
RS 485_A(A)
7
RS485A2
BDC 95045-A1
MIN TL-XH
Silk screen
Terminal serial number
Definition
Silk screen
Terminal serial number
Definition
INV
1
WAKE-(W-)
SYS COM
1
BAT.EN-
2
WAKE+(W+)
2
BAT.EN+
7
RS 485_B (B)
7
RS 485_B
8
RS 485_A(A)
8
RS 485_A
Connector A
Comm unication line B
COM “10" to “ W-”
COM “9" to “W +”
COM “8" to “B ”
COM “7" to “A ”
Specyfikacje produktu
| Marka: | Growatt |
| Kategoria: | Akumulator |
| Model: | ARK 5.12~25.6XH-A1 |
Potrzebujesz pomocy?
Jeśli potrzebujesz pomocy z Growatt ARK 5.12~25.6XH-A1, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą
Instrukcje Akumulator Growatt
23 Września 2024
22 Września 2024
21 Września 2024
21 Września 2024
20 Września 2024
Instrukcje Akumulator
- Cobra
- Leica
- Verico
- Einhell
- Fein
- Nitecore
- Worx
- Victron Energy
- CyberPower
- Sungrow
- Vetus
- Team Orion
- Husqvarna
- APC
- PNY
Najnowsze instrukcje dla Akumulator
2 Kwietnia 2025
20 Lutego 2025
20 Lutego 2025
31 Stycznia 2025
29 Stycznia 2025
9 Stycznia 2025
3 Stycznia 2025
2 Stycznia 2025
31 Grudnia 2025
30 Grudnia 2025