Instrukcja obsługi Growatt WIT 28-55K-HU-US L2

Growatt Niesklasyfikowane WIT 28-55K-HU-US L2

Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Growatt WIT 28-55K-HU-US L2 (2 stron) w kategorii Niesklasyfikowane. Ta instrukcja była pomocna dla 27 osób i została oceniona przez 14 użytkowników na średnio 4.4 gwiazdek

Strona 1/2
1. The content of this document is continually reviewed and amended, where necessary. Growatt reserves the right to make changes to the
material at any time and without notice. Unless otherwise agreed, this document is for quick installation guidance only. All information and
suggestions in this document do not constitute a warranty of any kind, express or implied. Growatt reserves all rights for final explanation.
2. This document is for quick installation guidance only. For details, please refer to the User Manual.
3. Machine damage caused by failure to follow the instructions is not covered under any warranty.
1. The Load Breaker and the Pass Breaker should be interlocked.
2. When determining the installation position of the inverter, please consider the position of the batteries and the distribution panel.
2. For export limitation, you are advised to connect an energy meter and current transformers to the inverter.
water pipes and power cables
buried under the ground.
Battery BOX
Quick Installation Manual
1
Note:
2
2
2
22.
.
.
..
Installation
System overview
2.1 Installation requirements
2.2 Floor-mounted installation
2
3
Note:
Note:
Unit: inch
4 in
Φ .0 47 in
2.76 in
4 in
Unit: inch
WIT 28-55K-HU-US L2 Quick Guide
1
1
1
11.
.
.
..
Overview
(13) Battery terminal (14) BMS power supply port
(15) GRID terminal
(16) LOAD terminal
(1) Front panel
(2) OLED display screen
(3) Battery status indicator
(4) Push button
(9) Communication port
(5) System indicator
(6) BMS communication port
( )7 Parallel communication port
( )8 Monitor communication port
(10) DC switch
(11) PV terminal (12) Network communication port
2
3
4
5
55.0
KW
Output Power
1
15
16
17
(17) Base
6
7
8
13
14
9
10 11
12
40 in
40 in
40 in
40 in
15 73 in.
22.62 in
PV
PCS
AC
Breaker
Phone
Meter
T
Grid
BAT
Primary Load
Load
Breaker
Load
Secondary Load
Bypass
Breaker
Grid
1
2
3
4
3.3.1 Assembling the PV connectors
1
2
3
4
5
Ensure that the cable cannot be pulled out from the
terminal after crimping.
Pull the PV cables back to check that they are connected
securely.
Ensure secure connection
by tightening the locking
nut.
Positive metal connector
Negative metal connector
Make sure the cable polarity is correct.
Ensure that the ground point on
the enclosure base has been
reliably connected to the on-site
ground busbar.
Once the cable connections
are complete, check if the
cable feed-through pipes
and cables are secured in
place, and finally lock the
AC junction box cover.
5
3.1 Grounding
3.2 GRID and LOAD side cable connection
Note:
Note:
3.3 DC connection
Unit: inch
Please prepare the cables listed below before electrical connections.
1. Make sure all switches are
OFF before connecting the
cables. For personal safety, do
not operate when power-on.
2. If the diameter of the cable
does not match the terminal,
please contact our after-sales
personnel.
3. The current carrying capacity
of cables should comply with
locally applicable regulations.
3
3
3
33.
.
.
..
Connecting cables
No.
Cable
Type
Recommended
specifications
1
Grounding cable
A multiple-core copper cable (yellow and
green)
1AWG
2
Grid cable
A multi-core copper cable
2/0AWG-400kcmil
3
Load cable
A multi-core copper cable
3AWG-400kcmil
4
PV input cable
Photovoltaic cable
12AWG-10AWG
5
Battery power supply cable
A single-core copper cable (red and black)
1AWG
6
BMS power supply cable
A multi-core copper cable
20 AWG-14AWG
7
Other communication cable
RS485
/
Note:
0.31-0.39 in
Positive metal contact
Negative metal contact
0.31-0.39 in


Specyfikacje produktu

Marka: Growatt
Kategoria: Niesklasyfikowane
Model: WIT 28-55K-HU-US L2

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z Growatt WIT 28-55K-HU-US L2, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje Niesklasyfikowane Growatt

Instrukcje Niesklasyfikowane

Najnowsze instrukcje dla Niesklasyfikowane

SmallRig

SmallRig VB99 SE Instrukcja

29 Stycznia 2025
QSC

QSC TSC-8 Instrukcja

29 Stycznia 2025
XTRARM

XTRARM XTR-FS5130 Instrukcja

29 Stycznia 2025
Sunding

Sunding SD-581G Instrukcja

29 Stycznia 2025
XTRARM

XTRARM XTR-FS5070 Instrukcja

29 Stycznia 2025
XTRARM

XTRARM XTR-FS2010 Instrukcja

29 Stycznia 2025
OSEE

OSEE TX402 Instrukcja

29 Stycznia 2025