Instrukcja obs艂ugi James QX5LCR
Przeczytaj poni偶ej 馃摉 instrukcj臋 obs艂ugi w j臋zyku polskim dla James QX5LCR (2 stron) w kategorii g艂o艣nik. Ta instrukcja by艂a pomocna dla 10 os贸b i zosta艂a oceniona przez 5.5 u偶ytkownik贸w na 艣rednio 4.8 gwiazdek
Strona 1/2

PBF Pre-construction Board Installation guide
PBF (
FLUSH
) PRE-CONSTRUCTION BOARD INSTALLATION GUIDE
Before installing the PBF pre-construction board,
we recommend securing two horizontal studs, at
PBF board height, between the vertical studs of
the chosen installation location to add additional
support.
1
2
Measure the PBF board and make an outline of the
board on a new panel of sheet rock.
4
3
After this has been done, ensure that the
board is level before fully securing it to the
wall studs.
Lay the frame panel of sheet rock over the PBF
board and fasten the frame to studs of the wall.
6
5
Cut along the traced path to make a frame for
the pre-construction board.
Once the board has been properly leveled, fasten
the PBF board to the vertical and horizontal studs.
Specyfikacje produktu
| Marka: | James |
| Kategoria: | g艂o艣nik |
| Model: | QX5LCR |
Potrzebujesz pomocy?
Je艣li potrzebujesz pomocy z James QX5LCR, zadaj pytanie poni偶ej, a inni u偶ytkownicy Ci odpowiedz膮
Instrukcje g艂o艣nik James
4 Stycznia 2025
4 Stycznia 2025
4 Stycznia 2025
4 Stycznia 2025
4 Stycznia 2025
4 Stycznia 2025
4 Stycznia 2025
4 Stycznia 2025
4 Stycznia 2025
4 Stycznia 2025
Instrukcje g艂o艣nik
- Atlas Sound
- BASSBOSS
- Adam
- Fun Generation
- Speco Technologies
- LOG Professional
- Phonic
- Aiwa
- Audyssey
- Techly
- Anker
- Nokia
- PSSO
- Eos
- Finlux
Najnowsze instrukcje dla g艂o艣nik
8 Kwietnia 2025
8 Kwietnia 2025
8 Kwietnia 2025
7 Kwietnia 2025
7 Kwietnia 2025
7 Kwietnia 2025
5 Kwietnia 2025
3 Kwietnia 2025
3 Kwietnia 2025
3 Kwietnia 2025