Instrukcja obsługi Jindara Tilga
Jindara Podgrzewacz Tilga
Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Jindara Tilga (2 stron) w kategorii Podgrzewacz. Ta instrukcja była pomocna dla 28 osób i została oceniona przez 3 użytkowników na średnio 5.0 gwiazdek
Strona 1/2

Zero Clearance
Cabinet Installation
ZCC Part No. 232367
Sheet 1 NEXT 2 GPN 232738 Rev.*
To suit Insert Models: Pearl & Tilga
35
40
ZCC Installation notes
This aapplince has been factory tted and attchaed insithde e ZCC. Depending on your desireds intalltiaon type, whehetr
iount be gratd llevel, or eevar a midted fo-wl alinstallation, the following sueseqnce of inta laltion steps may need toj be adusted
to suitFo. r any additiormnal infoation please rrefe to the Opeon d ratianInsaltlation Instrucotins supplied with the applanice, or contt ac
tahe deler from whom you purchased the heer fratom.
• Scelet titihe posonat th you wish toin stall your rInse t ZCC, carefullowiny allg for ue clearances of 305m imn the
rooavityf c (the outer e beiung 255mm reqreuis a 25mm clearancone either side to conmbustibles, makig overll cleaarance of
305mm), and alloowing fr su clecientarancesr us focombtibles where rear and side walls may play a roll in the insta latlion
process.
• Ensure there is access to a pwer soupplyins ide thncle eosuonnre fr coectinthg e fan in the heater. I some ninstacens an
exentsion cord miaybe requred to reh a pacower supplley. Pase keep in mindha tt the fan will noeed t be removed for c leang,ni
and access to the power soulupply shd be made relatasyively e.
• Roemve door (open door handle and swinoorg d open to rouhlgy 45deg and lift o hinge), reove casmt irn lineros and bae
system from inhside te rebox tou redce overl alweigh t of u. nit
• Using a 5m amllan key, remve p1-x4 M8 ocap screws which atacht tche fasiato the rebox. Carefullly remove the fascia and place
to the side. Removing faia ascllows the ZCC to be mounted u shwithont fr osurf encloe fae focr a sh fasciua nish.
• Insf italling a grtound lo aevel ont cousblmbtie r suroofacie, ple requacred oor protetocr under thsirede de posiotin of t he
ZCC than cally lrefuift the CC io poZntsition.
• Fit ue system to upstands and appliance. Instalthrol ugh roof acs per ue manufaturtes insructiominatns, and tere at the
ruireqed heighot abve the roof line, t c. Ne: te baowlothse of the actiuve e l wilneed tando be trimmed sealed with re cemt.en
• Build your frame ouarnd the ZCC maintaig nintleahe carnces listed previously.
• Enclose the front of tmhe frae wi mithnimum -m 9mnoncombustible cement sheet, villaboard, be lis boalrd etc.
• Enclose the sidee s of the framwitrh plaste , timber, MDF etc.
• Intasll the mantle if required as per mantle craes leancon the folloawing pge.
Note: If mantle ids mae out of combustaible mterial, this appliance must have i’s htot air deector attached tho te fasica.
• Rate-tach removable fascia & do or.
40 1000
835 600
765
35
Zero
Clearance
Cabinet
(ZCC)
18mism Bell Boa,rd
cement sheet or
eqivualntine m.
Tleinrip sk
Flue
noggin
800
side studs
945
mi. nwidth
Hearth
550
Foledr e evat
inastalltion detail
orarth he rtneducio
rr Intionefestalla
Ins ructtison
Sheet 1 NEXT 2 GPN 232738 Rev.*
If desirable, a non-
combustible noggin can
be attached closer than
1000mm above the base
of the appliance.
Specyfikacje produktu
| Marka: | Jindara |
| Kategoria: | Podgrzewacz |
| Model: | Tilga |
Potrzebujesz pomocy?
Jeśli potrzebujesz pomocy z Jindara Tilga, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą
Instrukcje Podgrzewacz Jindara
22 Września 2024
21 Września 2024
20 Września 2024
19 Września 2024
16 Września 2024
14 Września 2024
14 Września 2024
13 Września 2024
11 Września 2024
11 Września 2024
Instrukcje Podgrzewacz
Najnowsze instrukcje dla Podgrzewacz
4 Kwietnia 2025
4 Kwietnia 2025
3 Kwietnia 2025
2 Kwietnia 2025
30 Marca 2025
30 Marca 2025
29 Marca 2025
29 Marca 2025
27 Marca 2025
27 Marca 2025