Instrukcja obsługi Vemer Energy-3x130 PWRi
Vemer
Sprzęt pomiarowy
Energy-3x130 PWRi
Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Vemer Energy-3x130 PWRi (2 stron) w kategorii Sprzęt pomiarowy. Ta instrukcja była pomocna dla 11 osób i została oceniona przez 6 użytkowników na średnio 4.7 gwiazdek
Strona 1/2

User Manual
ACTIVE ENERGY METER
Read all the instructions carefully
TheENERGY-400 ENERGY-3x130 and are electronic static devices to read active energy in
three-phasesystemsdesignedtooperateinenvironmentswithmeasurementcategoryIIIand
pollution level 2 according to EN 61010-1 standard.
SAFETY WARNINGS
To guarantee correct installation, proceed as follows:
1) The appliance should be installed by a qualified operator
2) The appliance should be installed in a panel in such a way as to guarantee that the
terminals are inaccessible after fitting
3) A protection device against over-currents should be installed in the electrical system,
upstream of the energy meter
4) Connect the instrument as shown in the alongside diagrams
5) Before touching the connector terminals make sure that the wires to be connected or
already connected to the instrument are not live
6) Touch the dip-switches only when the instrument is not powered
7) Do not power or connect the instrument if any part of it is damaged
8) The instrument must be installed and activated in compliance with current electric
system standards.
Code Model Description
VN964300 ENERGY-400PWR Three-phaseenergymeter400VAC
VN966800 ENERGY-3x130PWR Three-phaseenergymeter3x130VAC
VN967600 ENERGY-3x130PWRi Three-phaseenergymeter3x130VAC
TECHNICAL SPECIFICATIONS
• Powersupply:
- 3x230 V AC phase-neutral (400VAC phase-phase) (-15% ÷ +10%)
for Energy-400 model
- 3x130 V AC phase-neutral (230VAC phase-phase) (-15% ÷ +10%)
for Energy-3x130 models
• Frequency:50/60Hz
• Ratedcurrent:5A
• Maximumcurrent:6A
• Minimumstart-upcurrent:15mA
• Maximumpowerconsumption:
- voltage circuits < 2,5 VA
- current circuits < 2,5 VA
• Meterconstant:1imp=¼kWh
• Voltageinputs:inputimpedance=2MΩ
• Currentinputs:
-shuntof0.022 (+/-10%)forΩPWR models
-coilswithgalvanicinsulationbetweenprimaryandsecondaryforEnergy-3x130PWRi
model
• Twoopticinsulatedimpulseoutput:
- impulse duration < 100 ms
- voltage 9÷24 V DC
- current < 20 mA
• Insulation:
-reinforcedbetweenimpulseoutputandotherterminals
- reinforced between terminals and parts accessible after installation
• CTavailable:5-10-25-50-75-100-125-150-200-250-300-400-500-600-8001000/5A
• Operatingtemperature:-10°C÷+45°C
• Storagetemperature:-25°C÷+70°C
• Relativehumidity:10÷90%noncondensing
• Classindex:classA(EN50470)
• Container:4moduleDIN
• Protectionlevel:IP20/IP40onthefront
INSTRUMENT DESCRIPTION
Dip-switchforCTsetting
Green warning light:lightsuptoindicatepoweron
Red warning light:flashestoindicatethattheinstrumentismeteringenergy
(1flash=¼kWh)
Yellow warning light:whenlittheinstrumentdetects¼kWhnegative(probable
incorrectentry)andremainslituntil¼kWhpositiveisdetected
ChecktheinsertionofCT:connectL1,L2,L3frompowerpaneltoP1ofCTand
connectP2ofCTtotheload.
Impulseoutput:Opticallyinsulated
Electro-mechanicalimpulsecounter:resolution1kWh
GUIDE TO INSTALLATION
1)Beforeinstallingtheinstrument,selecttherequiredtransformationratio,asshownin
panel C)
2) PWR ForEnergy-3x130 imodelonly,theCTsecondariesmaybeconnectedtoearth
3)Theinstrumentshouldbeconnectedasshowninthepanel ,inaccordancewiththeB)
CTcurrentdirections
4)Iftheerroristofallwithintheclasslimitsoftheinstrument,itisnecessarytousethe
current transformer in its linear operating field.
5)IftheinstrumentisactivethepowershouldbeswitchedofftochangetheCTratio.
6)Incaseofchangestothedip-switchwiththeinstrumentactived,theselocksinfault
conditionwithredandgreenlightsalwayson.Inthisconditiontheinstrumentdoesn’t
coun.
Torestorethecorrectoperation,repositiontheDIPswitchesintheinitialconditionor
resettheinstrumentbyremovingandrestoringpower.
REFERENCE STANDARDS
ConformitytoEUdirective:
2004/22/EC (MID)
2006/95/EC (Low Voltage - LVD)
isdeclaredwithreferencetothefollowingharmonisedstandards:
EN 61010-1
EN50470-1andEN50470-3
V3IS00244-100_02-2013
Mod. ENERGY-400 PWR
Mod. ENERGY-3x130 PWR
ENERGY-3x130 PWRi
Dimensions (A)
Connection diagrams (B)
Instrument description (C)
+
1
2
3
4
5
6
10
11
12
13
14
15
7
8
9
16
17
18
L3
L1
L2
L3
L2
L1
2 CT connection ( ) WITHOUT neutral (3 wires)PWR onlyi
1 kWh/pulse
Pulse output
I 20 mA≤
9÷24 VCC
PWRi
P1 P2
S1 S2
I
PWR
P1 P2
S1 S2
I
5
10
25
50
200
250
300
400
x/5 A1 234 x/5 A1 2 34
75
100
125
150
500
600
800
1000
ON OFF
N
L3
N
L1
L2
5
6
7
8
9
14
15
16
17
18
1
2
3
4
10
11
12
13
+
L3
L2
L1
3 CT connection WITH or WITHOUT neutral (3 or 4 wires)
1 kWh/pulse
Pulse output
I 20 mA≤
9÷24 VCC
72 60
87
45
1 460 0 0
14
60 0 0
Specyfikacje produktu
Marka: | Vemer |
Kategoria: | Sprzęt pomiarowy |
Model: | Energy-3x130 PWRi |
Potrzebujesz pomocy?
Jeśli potrzebujesz pomocy z Vemer Energy-3x130 PWRi, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą
Instrukcje Sprzęt pomiarowy Vemer
5 Października 2024
2 Października 2024
7 Września 2024
29 Sierpnia 2024
26 Sierpnia 2024
26 Sierpnia 2024
21 Sierpnia 2024
21 Sierpnia 2024
18 Sierpnia 2024
15 Sierpnia 2024
Instrukcje Sprzęt pomiarowy
- Sprzęt pomiarowy Janitza
- Sprzęt pomiarowy Technics
- Sprzęt pomiarowy Mitsubishi
- Sprzęt pomiarowy Mitutoyo
- Sprzęt pomiarowy LogiLink
- Sprzęt pomiarowy Tempest
- Sprzęt pomiarowy Ridgid
- Sprzęt pomiarowy Aqua Master Tools
- Sprzęt pomiarowy Hama
- Sprzęt pomiarowy Panasonic
- Sprzęt pomiarowy Megasat
- Sprzęt pomiarowy Shimano
- Sprzęt pomiarowy ZKETECH
- Sprzęt pomiarowy SilverCrest
- Sprzęt pomiarowy Uni-T
Najnowsze instrukcje dla Sprzęt pomiarowy
3 Kwietnia 2025
3 Kwietnia 2025
3 Kwietnia 2025
3 Kwietnia 2025
3 Kwietnia 2025
3 Kwietnia 2025
3 Kwietnia 2025
3 Kwietnia 2025
3 Kwietnia 2025
3 Kwietnia 2025