Instrukcja obsługi Vemer SOLAR-1
                    Vemer
                    
                    Niesklasyfikowane
                    
                    SOLAR-1
                
                                
    Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Vemer SOLAR-1 (2 stron) w kategorii Niesklasyfikowane. Ta instrukcja była pomocna dla 19 osób i została oceniona przez 10 użytkowników na średnio 4.1 gwiazdek
                        Strona 1/2
                    
                    
                    
1   Terminals for voltage and current inputs 
2   Backlit display (deactivatable) 
3   Red led: on indicates inserted load
4   Programming keys
5   Relay terminals
6   Not used
7   Deactivation insertion of the load
8   Measured power
9  Load inserted  
10   Programming parameters 
11   Setpoint or hysteresis exceeded (indicates the delay count Ton
  before insertion of the load or To  before release)  
12   Toroid for the measurement of the current produced by the system
  of generation net of the one absorbed by the load
2INSTRUMENT DESCRIPTION and DIMENSION
2
1
3
4
12
6
7
8
10
9
11
5
02-2023
REFERENCE STANDARDS
Compliance with Community Directives:
2014/35/UE (LVD) e 2014/30/UE (EMCD) 
is declared with reference to the following standards:
• EN 61010-1 • EN 61000-6-2 • EN 61000-6-3
information to users pursuant to art. 14 of the directive 
2012/19 / EU of the european parliament and of the council
of 4 july 2012 on waste electrical and electronic equipment (WEEE)
If the crossed-out bin symbol appears on the equipment  or packaging, 
this means the product must not be included with other general 
waste at the end of its working life.
The user must take the worn product to a sorted waste center, 
or return it to the retailer when purchasing a new one.
Products for disposal can be consigned free of charge (without any new purchase obligation)
 to retailers with a sales area of at least 400 m
2, if they measure less than 25 cm.
An effi cient sorted waste collection for the environmentally friendly disposal of the used device
or its subsequent recycling, helps avoid the potential negative effects on the environment
and people’s health, and encourages the re-use and/or
recycling of the construction materials.
Vemer S.p.A.
I - 32032 Feltre (BL) • Via Camp Lonc, 16
e-mail: info@vemer.it  -  web site: www.vemer.it 
V3IS01139-010 
Mod. SOLAR-1
Manuals 
download 
PDF
Reset parameters  
To restore the default parameters while the main screen is displayed and the LED is off, press the keys 
 and   simultaneously for 3 seconds at least,   appears on the display.rESEt
The default values are:
   • Setpoint: 1,0 kW 
   • Hysteresis: 0 kW 
   • Ton: 30 seconds
   • Toff: 30 seconds 
   • Relay: NO ( )rEL n0
   • Backlight: timed ( )
   • Decline load insertion: disabled
i = produced current
i
3 4
picture 2
Current
transformer
Insertable 
load  
Not 
disconnectable
 load 
picture 3
Connection diagram
M1
Measurement 
exchanged 
energy
kWh
DG
PdC
kvarh
i
LV Network
LV Network = Low Voltage Network
PdC = Connection Point
DG = General Device
M2
Measurement
produced
energy
User loads
kWh
kvarh
Photovoltaic panels
Current 
transformer
picture 1
3INSTALLATION
4OPERATION
OPERATION LOGIC 
Value:
(setpoint - hysteresis) 
connection
load zone 
disconnection
load zone 
Time
Power
Setpoint value 
Connection load 
Disconnection load 
Ton
power surplus generated 
Toff
The positioning of the current transformer is essential for the 
correct operation of the instrument.
• The correct position of the current transformer within
   the electrical system is shown in the picture 1 
• The direction of the produced current (i) is shown in the
   picture 2 (incoming current in the current transformer form
   the side indicated on the label)  
• The current transformer must be connected to the terminals
   3 and 4 of SOLAR-1 (respect the polarity):  
    - terminal 3: white thread 
    - terminal 4: black thread
Two loads or groups of loads must be identified as follows: 
• , that is the load which is always        not disconnectable load
   connected to the power line and which will not be released
   by the SOLAR-1 if the energy production is lower than 
   necessary (its consumption must in any case be counted
   by the device to determine the total consumption).  
• , which will be connected if the power insertable load
   surplus is higher than the setpoint. 
     DEFINITION OF OPERATION PARAMETERS 
•SEt P - Setpoint [kW] represents the activation threshold that is to say
   the minimum value of surplus of power necessary for connect the load. 
•hyst - Hysteresis (or differential) [kW] represents the value to subtract from
   the setpoint to determine the disconnection zone (that is to say the zone where
   the load is disconnected). This value can be set higher than the setpoint value.
   This setting of SOLAR-1 allows the use of all self-produced power and the use
   of the remaining power from the low voltage grid. 
•t0n -   [seconds] represents the period of time in which the power must beTon
   above the setpoint before the load is actually switched on. During this phase the
   red LED flashes and the icon   appears on the display.
•t0FF -   [seconds] represents the period of time in which the power must beToff
   lower than the set threshold before the load is released. During this phase the
   red LED flashes and the icon   appears on the display.  
•rELAY -  allows to set the operating logic of the relay betweenRelay 
   NO ( ) and NC (rEL n0 rEL n ). 
•LIGht -  allows you to set the operation of the display backlight between: Backlight 
  - 0N always on
  - 0FF always off
  -   timed (30 seconds at the push of a button)
   Example 1: if setpoint = 3 kW and differential = 0.5 kW any connected load is released if the measured absorbed power value is less than 2.5 kW
   Example 2: if setpoint = 3 kW and differential = 4 kW any connected load is released if the measured absorbed power value is less than “-1 kW”
                 (i.e. 1kW taken from the low voltage network). In this way the load will exploit all the self-produced power and the power of 1 kW from the low voltage grid.
1
User Manual
LOADS CONTROL 1 RELAY FOR ENERGY PRODUCTION
 Read all the instructions carefully 
Electronic instrument for controlling the self-produced active power of your 
photovoltaic system. If the power entered on the network (surplus of power, 
that is to say produced power – consumed power) is higher than a set 
threshold (setpoint) for a settable period of time (Ton), the SOLAR-1 switches 
on the load connected to the relay, in order to maximize the selfconsumption of 
the power produced. Load shedding occurs after a set table release time (Toff). 
     Code             Model            Description
     VE794000      SOLAR-1          Loads control for systems of energy production 1 relay 
SAFETY WARNINGS
    During the installation and the operation of the instrument it’s necessary
   to observe the following instructions:
  1)    The instrument must be installed by a qualified person by observing 
scrupulously the connection diagrams.
  2)   The instrument must be installed and activated in compliance with current 
   electric systems standards.
  3)   After installation, inaccessibility to the connection terminals without
   appropriate tools must be granted.
  4)   Do not use the instrument for other purposes different from the one
   specified.
  5)   The instrument must be installed in a closed electrical panel adequately
   protected.
  6)   In the power supply network a bipolar disconnection must be present.
  7)   A protection device against over-currents should be installed in the 
   electrical system, upstream of the device.
  8)   Before accessing the connection terminals, verify that the leads are not live.
  9)   Do not power on or connect the instrument if any part of it is damaged.
10)   The instrument can be used in environments with overvoltage category III 
   and pollution degree 2, according to the CEI EN 61010-1 standard.
      TECHNICAL CHARACTERISTICS
•   Power supply: 230 Vac (-15% ÷ +10%) 50/60 Hz
•   Maximum own consumption: 6 VA
•   Measurement precision: 2% of active power
•   Maximum diameter of the conductor through the TA: 10 mm
•   Current connection until 65 A through current transformer
•   Settable setpoint range: 0,1 ÷ 15 kW
•   Settable hysteresis range: 0 ÷ 15 kW
•   Time range Ton and Toff: 10  ÷ 999 seconds
•   Output: 1 monostable relay with exchange contact 16 A / 250 Vac
•   Blocks for cables with maximum section of 6 mm
2
•   Operating temperature: -10 °C ÷ 45 °C
•   Operating humidity: 10% ÷ 90% not condensing
•   Storage temperature: -10 °C ÷ 65 °C
•   Container: 2 modules DIN
•   Protection degree: IP20 / IP40 (on the front panel)   
•   Insulation: reinforced between accessible parts (front panel) and all other terminals
•   Type of actions: 1B 
5PROGRAMMING
10 ÷ 999 
seconds
10 ÷ 999 
seconds
0 ÷ 15 kW 0,1 ÷ 15 kW time - Off - On
To access the operating parameters selection menu, press the   key. Use the   and  keys to move within the menu and press   to access the 
parameter modification. Use the   and  keys to set the desired value and press the  key to confirm (the value will stop flashing for 2 seconds) and 
return to the selection menu or  to return to the selection menu without saving.
Decline load insertion 
To exclude relay switching, press and hold the   button 
for at least 3 seconds, the   icon appears on the display.
The SOLAR-1 will continue to measure the power, signaling 
by means of a flashing LED the exceeding of the set thresholds without 
inserting the load connected to the relay. To restore the normal operation
of the SOLAR-1 keep the   key pressed for at least 3 seconds. >3 seconds
>3 seconds
Specyfikacje produktu
| Marka: | Vemer | 
| Kategoria: | Niesklasyfikowane | 
| Model: | SOLAR-1 | 
Potrzebujesz pomocy?
Jeśli potrzebujesz pomocy z Vemer SOLAR-1, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą
Instrukcje Niesklasyfikowane Vemer
                        
                         4 Października 2024
                        
                    
                                                            
                        
                         3 Października 2024
                        
                    
                                                            
                        
                         1 Października 2024
                        
                    
                                                            
                        
                         27 Września 2024
                        
                    
                                                            
                        
                         22 Września 2024
                        
                    
                                                            
                        
                         22 Września 2024
                        
                    
                                                            
                        
                         21 Września 2024
                        
                    
                                                            
                        
                         21 Września 2024
                        
                    
                                                            
                        
                         18 Września 2024
                        
                    
                                                            
                        
                         16 Września 2024
                        
                    
                                                            Instrukcje Niesklasyfikowane
- Hotpoint
- UClear
- Reolink
- BluGuitar
- Cleco
- Insect Lore
- Cellular Line
- Lervia
- Medeli
- Ciarra
- Einhell
- Amazfit
- HP
- OBSBOT
- NAV-TV
Najnowsze instrukcje dla Niesklasyfikowane
                        
                         29 Stycznia 2025
                        
                    
                                                            
                        
                         29 Stycznia 2025
                        
                    
                                                            
                        
                         29 Stycznia 2025
                        
                    
                                                            
                        
                         29 Stycznia 2025
                        
                    
                                                            
                        
                         29 Stycznia 2025
                        
                    
                                                            
                        
                         29 Stycznia 2025
                        
                    
                                                            
                        
                         29 Stycznia 2025
                        
                    
                                                            
                        
                         29 Stycznia 2025
                        
                    
                                                            
                        
                         29 Stycznia 2025
                        
                    
                                                            
                        
                         29 Stycznia 2025