1 5 OPERATIONUser Manual
LOADS CONTROL 3 RELAYS FOR ENERGY PRODUCTION
 Read all the instructions carefully
DIMENSIONS
INSTRUMENT DESCRIPTION
INSTALLATION
272 60
88
45
1
2
3
4.1
4.2
4
5
6
Alar m
PRG
PC3R
Out  1 Out  2 Out  3
ON OFF O N OFF
ON OFF
Re se t
Alar m
PRG
PC3R
Out  1 Out  2 Out  3
ON OFF ON OFFON OFF
Re se t
Alar m
PRG
PC3R
Out  1 Out  2 Out  3
ON OFF ON OFFON OFF
Re se t
Alar m
PRG
PC3R
Out  1 Out  2 Out  3
ON OFF ON OFFON OFF
Re se t
Alar m
PRG
PC3R
Out  1 Out  2 Out  3
ON OFF ON OFFON OFF
Re se t
Alar m
PRG
PC3R
Out  1 Out  2 Out  3
ON OFF ON OFFON OFF
Re se t
PRG
PRG PRG PRG PRG PRG PRG PRG PRG
PRG
Setpoint - Hysteresis
connection 
loads 
zone
disconnection 
loads 
zone
delay OFFdelay ON delay ON
Time
Power
Setpoint
Connection load 2 ( the second one more priority)
Discon-
nection 
load 2
Connection load 1 (more priority)
1  2  3 1  2  3 1  2  3 1  2  3 1  2  3
Connection load 2
connected load disconnected load surplus of produced power 
Power supply
LV Network = Low Voltage Network
CP = Connection Point
DG = General Device
Vemer S.p.A.
I - 32032 Feltre (BL) • Via Camp Lonc, 16
Tel +39 0439 80638 • Fax +39 0439 80619
e-mail: info@vemer.it  -  web site: www.vemer.it 
V3IS00705-012
 Mod. SOLAR-3
  Red led: on if the consumed power is higher than the setpoint
  Keys increase/ decrease
  Key PRG:  instrument programming/confirmation
    - brief pressure = lower than 3 seconds
    - long pressure = higher than 3 seconds
  Data  view display
    4.1 Surplus of measured power 
    4.2  Segments for loads status indication 
(disconnected = fixed on, connected = flashing)
  Power  supply terminals/inputs
    Terminals 6-8: voltage input/instrument power supply
    Terminals 8-9: current input through current transformer
  Relays terminals for loads connection
Electronic instrument for the control of active power self-produced by your 
photovoltaic system.
If the power entered on the network (surplus of power, that is to say produced 
power – consumed power) is higher than a programmed threshold (setpoint) 
the SOLAR 3 provides for the connection of some loads that you can stop in 
order to maximize the own consumption of the produced power. It’s possible 
to control until 3 loads (or groups of loads) through the command of as many 
relays, to whom is assigned a priority which sets the order with whom the loads 
are connected.
Code   Model   Description
VE474300  SOLAR-3  Loads control for systems of energy production 3 relays
SAFETY WARNINGS
   During the installation and the operation of the instrument it’s necessary to 
observe the following instructions:
  1)   The instrument must be installed by a qualified person by observing 
scrupulously the connection diagrams 
  2)   The instrument must be installed and activated in compliance with current 
electric systems standards.
  3)   After installation, inaccessibility to the connection terminals without appropriate 
tools must be granted
  4)   Do not use the instrument for other purposes different from the one specified
  5)   The instrument must be installed in a closed electrical panel adequately 
protected
  6)   In the power supply network a bipolar disconnection must be present
  7)   A protection device against over-currents should be installed in the electrical 
system, upstream of the device.
  8)   Before accessing the connection terminals, verify that the leads are not live
  9)   Do not power on or connect the instrument if any part of it is damaged
10)   In case of malfunction do not perform repairs and contact immediately the 
technical support
11)   The instrument can be used in environments with category of measurement III 
and pollution degree 2, as per standards CEI EN 61010-1. 
TECHNICAL CHARACTERISTICS
•   Power supply: 230Vac (-15% ÷ +10%) 50/60 Hz
•  Maximum own consumption: 8 VA
•   Voltage input consumption: < 2,5VA
•   Current input consumption: < 2,5VA
•   Measurement precision: 2% full scale
•  Current connection until 60A through current transformer
•  Settable setpoint range: 0,1 ÷ 15 kW
•  Settable hysteresis range: 0 ÷ setpoint
•  Output: 3 monostable relays with exchange contact 16A / 250Vac
•  Blocks for cables with maximum section of 6 mm
2
•  Operating temperature: -10°C ÷ 45°C
•  Operating humidity: 10% ÷ 90% non condensing
•  Storage temperature: -10°C ÷ +65° C
•  Container: 4 modules DIN
•  Protection degree: IP20 / IP51 (on the front panel)
• 
Insulation: reinforced between accessible parts (front panel) and all other terminals
•  Type of actions: 1B
The positioning of the current transformer is essential for the correct operation of the 
instrument.
•   The correct position of the current transformer within the electrical system is 
shown in the picture 1
•   The direction of the produced current (i) is shown in the picture 2 (incoming 
current in the current transformer form the side indicated on the label)
•  The current transformer must be connected to the terminals 8 and 9 of SOLAR-3:
  -  terminal 8: white thread
  -  terminal 9: black thread
Four loads or groups of loads must be located:
 not disconnectable loads, that is to say the loads which are always connected 
to the electrical line and which will not disconnect by SOLAR-3 if the production 
of energy is lower than necessary (their consumption must be counted anyway by 
SOLAR-3 to determine the total consumption)
connectable loads with priority 1, which will be connected for first if the surplus 
of power is higher than the setpoint
connectable loads with priority 2
connectable loads with priority 3
The SOLAR-3 switches on with the disconnected loads; every   seconds Delay On
one load is connected (if the surplus of power is higher than the setpoint).
During the normal operation the instrument shows the 
surplus of produced power (expressed with two decimals) 
and relays status (segment on fixed if disconnected load, 
flashing segment if connected load)
The programmed setpoint can be showed for three 
seconds by pressing the key   .
Configuration relays (normally 
open or normally closed) can be 
showed by pressing the key   
and then relays priority. Each 
display is visible for 3 seconds.
The device reset can be performed by pressing simultaneously the keys   
and   : the loads are disconnected and then reconnected according to the set 
priority.
DEFINITION AND MODIFICATION OF OPERATION PARAMETERS
•   [kW] represents the activation threshold that is to say the minimum value of surplus of power so that the instrument provides for the connection of the loads  Setpoint
according to the priority.
•   Hysteresis (or differential) (kW) represents the value to subtract from the setpoint to determine the disconnection zone (that is to say the zone where the loads are 
disconnected).
  For example, if the setpoint = 3 Kw and differential = 0.5 kW the loads eventually connected are disconnected if the value of measured absorbed power is lower than 2.5 kW.
•   Delay On [seconds] represents the minimum time which must elapse from the last connection (or disconnection) of one load before connecting another one. This time is 
valid also at start-up that is to say , even if the surplus of power allowed, no load is connected before Delay seconds elapse from the switch on.
•   Delay Off 
[seconds] represents the delay of disconnection, that is to say how long the surplus of power must result lower than the 
setpoint – hysteresis before the instrument 
disconnects one load.
To access the modification or the operation parameters display press the key  . 
 REFERENCE STANDARDS
Compliance with Community Directives:
2006/95/EC (Low Voltage) 2004/108/EC (E.M.C.)
is declared with reference to the following standards:
• EN 61010-1
• EN 61000-6-2 and 61000-6-3
Not 
disconnectable 
loads
Connectable 
loads with 
priority 1
Connectable 
loads with 
priority 2
Connectable 
loads with 
priority 3
OPERATION LOGIC
Setpoint modification
Value: 0.1 ÷ 15 kW
default = 1 kW
Hysteresis modification
Value: 0 ÷ setpoint kW
default = 0 kW
Intervention time 
modification
Value: 10 ÷ 999 s
default = 30 s
Disconnection time 
modification
Value: 10 ÷ 999 s
default = 30 s
Example of valid connection 
with priority and not modified 
logic of relays operation
i
8 9
Picture 1 Picture 2 Picture 3
LV Network
M1
Measurement 
exchanged 
energy
M2
Measurement 
produced 
energy
User loads
kWh
DG
CP
Current transformer
i = produced current
kWh
kvarh
kvarh
i
Photovoltaic panels
Specyfikacje produktu
| Marka: | Vemer | 
| Kategoria: | Niesklasyfikowane | 
| Model: | SOLAR-3 | 
Potrzebujesz pomocy?
Jeśli potrzebujesz pomocy z Vemer SOLAR-3, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą
Instrukcje Niesklasyfikowane Vemer
                        
                         4 Października 2024
                        
                    
                                                            
                        
                         3 Października 2024
                        
                    
                                                            
                        
                         1 Października 2024
                        
                    
                                                            
                        
                         27 Września 2024
                        
                    
                                                            
                        
                         22 Września 2024
                        
                    
                                                            
                        
                         22 Września 2024
                        
                    
                                                            
                        
                         21 Września 2024
                        
                    
                                                            
                        
                         21 Września 2024
                        
                    
                                                            
                        
                         18 Września 2024
                        
                    
                                                            
                        
                         16 Września 2024
                        
                    
                                                            Instrukcje Niesklasyfikowane
- AudioThing
- Igloohome
- Infinity
- Vtech
- Das Keyboard
- Exelpet
- Oben
- Kwantum
- Yuede
- AMC
- Extron
- Global
- Barska
- Holman
- Scotsman
Najnowsze instrukcje dla Niesklasyfikowane
                        
                         29 Stycznia 2025
                        
                    
                                                            
                        
                         29 Stycznia 2025
                        
                    
                                                            
                        
                         29 Stycznia 2025
                        
                    
                                                            
                        
                         29 Stycznia 2025
                        
                    
                                                            
                        
                         29 Stycznia 2025
                        
                    
                                                            
                        
                         29 Stycznia 2025
                        
                    
                                                            
                        
                         29 Stycznia 2025
                        
                    
                                                            
                        
                         29 Stycznia 2025
                        
                    
                                                            
                        
                         29 Stycznia 2025
                        
                    
                                                            
                        
                         29 Stycznia 2025