Instrukcja obsługi Gossen Metrawatt PROFiSIM 1
Gossen Metrawatt
Niesklasyfikowane
PROFiSIM 1
Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Gossen Metrawatt PROFiSIM 1 (2 stron) w kategorii Niesklasyfikowane. Ta instrukcja była pomocna dla 20 osób i została oceniona przez 10.5 użytkowników na średnio 4.8 gwiazdek
Strona 1/2

3-349-895-03
2/8.16
GMC-I Messtechnik GmbH
PROFISIM 1
Installation Board: “Service Line with Main Grounding Busbar” for Fault Simulation for
Measurements per IEC 60364-6 (DIN VDE 0100-600) and EN 50110 (DIN VDE 0105-100)
Applications
Target groups:
Training personnel (electricians):
• Teachers
• Trainers
• Instructors
• Laboratory supervisors
Learners:
• Trainees
• Students
• Apprentices
Content
• Simulation of a building service line with main fuse
• Simulation of external and internal lightning protection
• Main grounding busbar with all important equipotential bond-
ing cables and earth strips
• Implementation of various mains systems (TT, TN)
• Preparation of test reports in accordance with DIN VDE 0100
Description
The installation board functions as a compact building service line
with main grounding busbar for consumer systems including an
fault simulator.
It’s used primarily for training sessions and project work covering
all aspects of “testing systems in accordance with DIN VDE 0100-
600”.
The board is equipped with all of the necessary modules of a
building supply line including an extended main grounding busbar
for the implementation of testing and fault options.
Applicable Regulations and Standards
IEC 61010-1/
DIN EN 61010-1/
VDE 0411-1
Safety requirements for electrical equipment for mea-
surement, control and laboratory use
– General requirements
IEC 60364-6
DIN VDE 0100-600
Low-voltage electrical installations
– Part 6: Tests
EN 50110
DIN VDE 0105-100
Operation of electrical installations
– Part 100: General requirements
EN 60529
VDE 0470-1
Test instruments and test procedures
Degrees of protection provided by enclosures (IP code)
• Service line with main grounding busbar
• External and internal lightning protection
• Earthing measurements
• TN/TT systems
• Simulation of faults via 12 switches
• Single and double fault circuit
• Lockable fault switching panel
• Console-like housing
• Can be used as a benchtop device or in an experimentation
frame

Edited in Germany • Subject to change without notice • PDF version available on the Internet
PROFISIM 1
Installation Board: “Service Line with Main Grounding Busbar” for Fault Simulation for
Measurements per IEC 60364-6 (DIN VDE 0100-600) and EN 50110 (DIN VDE 0105-100)
GMC-I Messtechnik GmbH
Südwestpark 15
90449 Nürnberg, Germany
Phone: +49-911-8602-111
Fax: +49 911 8602-777
e-mail info@gossenmetrawatt.com
www.gossenmetrawatt.com
Technical Data
Simulation of a Building Installation
• Simulation of external lightning protection:
R1, R2 = 0.1 Ω, 0.2 Ω, 1.0 Ω, ∞, Imax. = 200 mA
• Earth simulation:
RE = 0.5
Ω
, 1.0
Ω
, 2.0
Ω
, 5.0
Ω
, 10
Ω
, 50
Ω
, 100
Ω
, Imax. = 5 A
• Simulation of the
auxiliary earth electrode: RH = 0 ... 1 kΩ, Imax. = 10 mA
• Simulation of the earth probe:
RS = 0 ... 50 k
Ω
, Imax. = 10 mA
• Simulation of the operational
earth electrode: RB = 1.5 Ω, Imax. = 10 A
• Connection panel for downstream sub-distributors of a con-
sumer system
Fault Simulation
Fault simulator with 12 fault options via switches
Connection Values
Mains connection 16 A CEE plug
Connector cable Approx. 2.5 m
Nominal voltage 3 x 230/400 V
Frequency 50/60 Hz
Protection category I
Mechanical Design
Dimensions 297 x 456 x 80 mm
Weight Approx. 2.2 kg
Inputs/outputs 4 mm safety sockets
Ambient Conditions
Ambient temperature
Max. +35 °C
Relative humidity
Max. 60%, condensation is ruled out
Scope of Delivery
Installation board
Operating instructions
Test specification
Short circuit jumpers
Keys for fault simulator
Order Information
PROFiSIM case with PROFiSIM 1
No. Fault Description Comment
1
Interruption of the equipotential bonding cable
from the main grounding busbar to the water pipe
R = ∞
2
Contact resistance in the equipotential bonding ca-
ble from the main grounding busbar to the gas pipe
R = approx. 4 Ω
3 Interruption of the equipotential bonding cable
from the main grounding busbar to the heater
R = ∞
4
Contact resistance in the equipotential bonding ca-
ble from the main grounding busbar to the continu-
ous-flow water heater
R = approx. 3 Ω
5 Insulation resistance, L1-PE RL1-PE = approx. 780 kΩ
6 Insulation resistance, L2-PE RL2-PE = approx. 780 kΩ
7 Insulation resistance, L1-PE and L3-PE RL1-PE = approx. 780 kΩ,
RL3-PE = approx. 440 kΩ
8 Voltage-dependent insulation resistance When measured with a
multimeter resistance is OK.
When measured with a VDE tes-
ter with rising test voltage a volt-
age dip occurs at approx. 300 V.
> Overvoltage protection type 3
9 Protective conductor resistance in PEN conduc-
tor too high
RPE = approx. 5.6 Ω
10 Protective conductor resistance, output, plate RPE = approx. 3.0 Ω
11 Loop impedance too high ZL1-PE = approx. 5.6 Ω
12 Loop impedance too high ZL1-PE = approx. 5.6 Ω,
ZL3-PE = approx. 8.6 Ω
Designation Type Article Number
Installation board PROFISIM 1 M560A
Case for PROFiSIM 1/2 PROFiSIM case Z560A
Specyfikacje produktu
Marka: | Gossen Metrawatt |
Kategoria: | Niesklasyfikowane |
Model: | PROFiSIM 1 |
Potrzebujesz pomocy?
Jeśli potrzebujesz pomocy z Gossen Metrawatt PROFiSIM 1, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą
Instrukcje Niesklasyfikowane Gossen Metrawatt
3 Stycznia 2025
3 Stycznia 2025
3 Stycznia 2025
3 Stycznia 2025
3 Stycznia 2025
31 Grudnia 2025
16 Grudnia 2024
4 Października 2024
3 Października 2024
3 Października 2024
Instrukcje Niesklasyfikowane
- Niesklasyfikowane Rosieres
- Niesklasyfikowane Martha Stewart
- Niesklasyfikowane TOOLMATE
- Niesklasyfikowane Manhattan
- Niesklasyfikowane FOX ESS
- Niesklasyfikowane Earthwise
- Niesklasyfikowane Colonial Elegance
- Niesklasyfikowane Hubble Connected
- Niesklasyfikowane Geneva
- Niesklasyfikowane Theben
- Niesklasyfikowane Deltaco
- Niesklasyfikowane Banoch
- Niesklasyfikowane Freedor
- Niesklasyfikowane Leaptel
- Niesklasyfikowane Silhouette
Najnowsze instrukcje dla Niesklasyfikowane
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025