Instrukcja obsługi Gossen Metrawatt LABKON P500
Gossen Metrawatt
Niesklasyfikowane
LABKON P500
Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Gossen Metrawatt LABKON P500 (38 stron) w kategorii Niesklasyfikowane. Ta instrukcja była pomocna dla 14 osób i została oceniona przez 7.5 użytkowników na średnio 4.3 gwiazdek
Strona 1/38


LABKON Series
_________________________________________________________________________________________________
2 GMC-I Messtechnik GmbH
GOSSEN METRAWATT LABKON Series
SWITCHING-MODE DC POWER SUPPLY
GOSSEN METRAWATT LABKON Series is a series of programmable switching-mode DC power supplies with RS232 and
USB (optional) or GPIB (optional) interfaces. The good durability, simple operation, low noise, excellent output accuracy as
well as the adjustment from 0V make this series of reliable power supplies the right choice for many applications. It provides
flexible and stable DC power for various design and test environments.
Versatile Bench-Top Features
High definition liquid crystal display
Full-featured keyboard and knobs
High-efficient switching-mode power supply
Low ripple and noise which rivals the linear power supply
Excellent line and load regulation
Up to 10 operating states storage and recall
Portable, ruggedized case and flexible system functions
Standardized RS232 interface, optional GPIB or USB
SCPI ( Standard Commands for Programmable Instruments) compatibility
Direct setting of I/O Parameters from front-panel

LABKON Series
_________________________________________________________________________________________________
GMC-I Messtechnik GmbH 3
The Front Panel at a Glance
1. AC power switch 2. Sense terminals
3. Earth ground terminal 4. Supply output terminals
5. Output on/off key 6. Left/Right key
7. Control knob 8. Up/Down key
9. Menu setting key 10. Voltage setting key
11. Current setting key 12. Switch key (second menu level)
13. Store key (second menu level) 14. Recall key (second menu level)
15. Error key (second menu level) 16 Local key (second menu level)
17. Secure key (second menu level) 18. Number key
19. Clear key (second menu level) 20. Enter key
21. Display screen 22. ERR annunciator
23. REM annunciator
1. AC power switch: Turns the AC power on and off.
2. Sense terminals: Senses voltage level at device under test (DUT), the positive pole is in red, the negative pole is in
black.
3. Earth ground terminal: It is connected to the chassis and earth ground.
4. Supply output terminals: Supply output, the positive output terminal is in red, the negative output terminal is in black.
5. Output on/off key: Turns the power supply output on/off.
6. Left/Right key: Moves the blinking digit to left or right, or selects different options.
7. Control knob: Adjusts the value of the blinking digit or selects different options by turning clockwise or counter clockwise.
8. Up/Down key: Turns the menu page.
9. Menu setting key: Enters menu setting contents.
10. Voltage setting key (VSET): Displays or modifies the present voltage setting value.
11. Current setting key (ISET): Displays or modifies the present current setting value.
Specyfikacje produktu
Marka: | Gossen Metrawatt |
Kategoria: | Niesklasyfikowane |
Model: | LABKON P500 |
Potrzebujesz pomocy?
Jeśli potrzebujesz pomocy z Gossen Metrawatt LABKON P500, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą
Instrukcje Niesklasyfikowane Gossen Metrawatt
3 Stycznia 2025
3 Stycznia 2025
3 Stycznia 2025
3 Stycznia 2025
3 Stycznia 2025
31 Grudnia 2025
16 Grudnia 2024
4 Października 2024
3 Października 2024
3 Października 2024
Instrukcje Niesklasyfikowane
- Niesklasyfikowane Joie
- Niesklasyfikowane Sun Pumps
- Niesklasyfikowane GAM
- Niesklasyfikowane Sharkbite
- Niesklasyfikowane ZAZU
- Niesklasyfikowane Remington
- Niesklasyfikowane Dirt Devil
- Niesklasyfikowane ZWO
- Niesklasyfikowane Mean Well
- Niesklasyfikowane BluGuitar
- Niesklasyfikowane Primacoustic
- Niesklasyfikowane Raveland
- Niesklasyfikowane Eura
- Niesklasyfikowane Evenflo
- Niesklasyfikowane Tube-Tech
Najnowsze instrukcje dla Niesklasyfikowane
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025