Instrukcja obsługi Sharp NQ-R258H


Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Sharp NQ-R258H (4 stron) w kategorii Niesklasyfikowane. Ta instrukcja była pomocna dla 7 osób i została oceniona przez 4 użytkowników na średnio 3.7 gwiazdek

Strona 1/4
SIM424-003
1
PLEASE READ THIS MANUAL CAREFULLY BEFORE INSTALLING OR USING THE MODULES.
PLEASE PASS ALONG THE ATTACHED USER MANUAL TO YOUR CUSTOMER.
INSTALLATION MANUAL
Crystalline Photovoltaic Module
# GENERAL INSTRUCTIONS p.1 ~ p.3
# INSTALLATION MANUAL -PHOTOVOLTAIC MODULES- p.4
# ELECTRICAL OUTPUT AND THERMAL CHARACTERISTICS p.4
IMPORTANT SAFETY INSTRUCTIONS
This manual contains important safety instructions for the PV
module that must be followed during the maintenance of PV
modules.
To reduce the risk of electric shock, do not perform any servicing
unless you are qualied to do so.
1. The installation must be performed by a certied installer
/servicer to ensure system integrity and safety.
2. The installation is only allowed after referring and
understanding of GENERAL INSTALLATION MANUAL and
INSTALLATION MANUAL -PHOTOVOLTAIC MODULE-. If
you dont have your personal copy, please contact your
installer or local Sharp oce listed in Sharp Solar web site :
URL : http://www.sharp-world.com/solar
3. Do not pull the PV cables.
4. Do not touch any surface of module.
5. Do not place/drop objects onto the PV modules.
6. Do not disassemble or attempt to repair the PV module by
yourself.
7. Do not drop the PV module.
8. Do not damage, pull, bend, or place heavy material on cables.
9. Upon completion of any service or repairs, ask the
installer/servicer to perform routine checks to determine that
the PV modules are in safe and proper operating condition.
10. When replacement parts are required, be sure the
installer/servicer uses parts specied by the manufacturer with
same characteristics as the original parts. Unauthorized
substitutions may result in re, electric shock, or other hazard.
11. Consult your local building and safety department for required
permits and applicable regulations.
12. In regions with snow, the module can sustain a snow load of
up to 50cm (when the module is mounted in the portrait
orientation / short frame side facing down) or 100cm (when
the module is mounted in the landscape orientation / long
frame side facing down).
13. As a result of sliding snow, the mechanical load increases
when the number of module rows in the matrix of a PV
installation increases. When mounting the module in the
portrait orientation for more than 3 rows, the accumulated
snow load may cause the lower edge of the module frame to
deform. Take necessary measures (e.g. snow stopper) to
avoid possible damage.
14. Periodically remove any overhanging snow and/or ice from the
module framework as it may cause deformation of the module
frame.
GENERAL INSTRUCTIONS
1. INTRODUCTION
This Installation Manual contains essential information for the electrical and mechanical installation that you must know before
installing SHARP PV modules. This also contains safety information you need to be familiar with. All the information described in
this manual are the intellectual property of SHARP and based on the technologies and experiences that have been acquired and
accumulated in the long history of SHARP. This document does not constitute a guaranty, expressed or implied. SHARP does
not assume responsibility and expressly disclaims liability for loss, damage, or expense arising out of or in any way connected
with installation, operation, use or maintenance of the PV modules. No responsibility is assumed by SHARP for any infringement
of patents or other rights of third parties that may result from use of PV module. SHARP reserves the right to make changes to
the product, specications or installation manual without prior notice.
2. COMPONENTS
3. GENERAL INFORMATION
(INCLUDING WARNING AND SAFETY)
The installation of PV modules requires a great degree of skill
and should only be performed by a qualied licensed
professional, including licensed contractors and licensed
electricians. Please be aware that there is a serious risk of
various types of injury occurring during the installation
including the risk of electric shock. All SHARP PV modules are
equipped with a permanently attached junction box that will
accept variety of wiring applications or with a special cable
assembly for ease of installation, and they do not require
special assembly.
MODEL
NQ-R258H
CAUTION: HIGH VOLTAGE
To reduce the risk of electric shock, do not touch.


Specyfikacje produktu

Marka: Sharp
Kategoria: Niesklasyfikowane
Model: NQ-R258H

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z Sharp NQ-R258H, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje Niesklasyfikowane Sharp

Sharp

Sharp PN-60TW3 Instrukcja

5 Stycznia 2025
Sharp

Sharp NU-RJ285 Instrukcja

5 Stycznia 2025
Sharp

Sharp NU-RJ280 Instrukcja

5 Stycznia 2025
Sharp

Sharp NU-AK310 Instrukcja

5 Stycznia 2025
Sharp

Sharp NU-AF370 Instrukcja

5 Stycznia 2025
Sharp

Sharp NQ-R258H Instrukcja

5 Stycznia 2025
Sharp

Sharp NU-RD300 Instrukcja

5 Stycznia 2025
Sharp

Sharp NU-AH370 Instrukcja

5 Stycznia 2025
Sharp

Sharp NU-AH360 Instrukcja

5 Stycznia 2025
Sharp

Sharp NU-AC310 Instrukcja

5 Stycznia 2025

Instrukcje Niesklasyfikowane

Najnowsze instrukcje dla Niesklasyfikowane

SmallRig

SmallRig VB99 SE Instrukcja

29 Stycznia 2025
QSC

QSC TSC-8 Instrukcja

29 Stycznia 2025
XTRARM

XTRARM XTR-FS5130 Instrukcja

29 Stycznia 2025
Sunding

Sunding SD-581G Instrukcja

29 Stycznia 2025
XTRARM

XTRARM XTR-FS5070 Instrukcja

29 Stycznia 2025
XTRARM

XTRARM XTR-FS2010 Instrukcja

29 Stycznia 2025
OSEE

OSEE TX402 Instrukcja

29 Stycznia 2025