Instrukcja obsługi Schneider MTN646991
Schneider
Niesklasyfikowane
MTN646991
Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Schneider MTN646991 (2 stron) w kategorii Niesklasyfikowane. Ta instrukcja była pomocna dla 12 osób i została oceniona przez 6.5 użytkowników na średnio 4.3 gwiazdek
Strona 1/2

The control unit 0-10 V REG-K/3-gang with manual
mode dims and switches fluorescent lamps using
electronic ballasts with a 0-10 V/1-10 V interface and LV
halogen lamps using transformers with a 0-10 V/1-10 V
interface.
|The control voltage range can be set with the
ETS via a parameter.
You can also manually switch the connected loads with
the manual switches on the control unit without bus
voltage.
The control unit has a bus coupler. It is installed on a
DIN rail acc. to EN 60715, with the bus connection
made via a bus connecting terminal. A data rail is not
required.
For your safety
HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR
ARC FLASH
Safe electrical installation must be carried out only by
skilled professionals. Skilled professionals must prove
profound knowledge in the following areas:
• Connecting to installation networks
• Connecting several electrical devices
• Laying electric cables
• Connecting and establishing KNX networks
• Safety standards, local wiring rules and regulations
Failure to follow these instructions will result in
death or serious injury.
The device may be damaged!
• Only operate the device according to the specifica-
tions stated in the Technical data.
• All the devices that are installed next to the binary in-
put must be equipped with basic insulation at the very
least.
Failure to follow these instruction can result in
equipment damage.
Control unit introduction
ABus connecting terminal
BCable cover
CProgramming button
DProgramming LED (red)
EOperating LED "RUN" (green)
FManual switch
GChannel terminals for load voltage
HOutputs 1-10 V
1Set the control unit onto the DIN rail.
2Connect KNX.
¼WARNING
Risk of fatal injury from electrical current. The
device could become damaged.
Safety clearance must be guaranteed in
accordance with IEC 60664-1. There must be at
least 4 mm between the individual cores of the
230 V supply cable and the KNX line.
½WARNING
Risk of fatal injury from electrical current. The
device could become damaged.
Disconnect the mains voltage before connecting
the device to the load.
Terminals may not be inserted under load.
Connections, displays and operating
elements
Installing the control unit
1 2 3
B
E
A
C
D
F
H
G
2
1
3
5 mm
1 2
3 4
230 V
4 mm
KNX
3Connect the bus voltage.
4Connect the load.
5Connect the load voltage.
1Press the programming button.
The programming LED lights up.
2Load the physical address and application into the
device from the ETS.
The programming LED goes out.
The operating LED lights up: The application was loaded
successfully, the device is ready for operation.
AControl unit
BElectronic ballast with 0-10 V/1-10 V interface
CFluorescent lamp
DElectronic transformer with 0-10 V/1-10 V
control input
ELV halogen lamps
FTo other devices with 0-10 V/1-10 V interface
Putting the actuator into operation
KNX
+ -
NL1
L
-
+
0-10V
0-10V
12V AC
A
-
+
L
N
-
+
L
N
F
D
B
0-10V
C
E
16 A
SpaceLogic KNX Control unit 0-10 V REG-K/
3-gang with manual mode
Operating instructions
Art. no. MTN646991
en
123
V6469-562-01 11/21
Specyfikacje produktu
| Marka: | Schneider |
| Kategoria: | Niesklasyfikowane |
| Model: | MTN646991 |
Potrzebujesz pomocy?
Jeśli potrzebujesz pomocy z Schneider MTN646991, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą
Instrukcje Niesklasyfikowane Schneider
1 Stycznia 2025
1 Stycznia 2025
12 Grudnia 2024
6 Grudnia 2024
6 Grudnia 2024
8 Października 2024
8 Października 2024
7 Października 2024
7 Października 2024
7 Października 2024
Instrukcje Niesklasyfikowane
- Hubble Connected
- AvMap
- Simplecom
- Avantone Pro
- Digitus
- AS Synthesizers
- Ziehl
- Iadea
- Grohe
- Razorri
- Salicru
- B-tech
- Amgrow
- Sinbo
- Tru Components
Najnowsze instrukcje dla Niesklasyfikowane
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025
29 Stycznia 2025