Instrukcja obsługi Optex CKB-312


Przeczytaj poniżej 📖 instrukcję obsługi w języku polskim dla Optex CKB-312 (2 stron) w kategorii Niesklasyfikowane. Ta instrukcja była pomocna dla 11 osób i została oceniona przez 6 użytkowników na średnio 4.8 gwiazdek

Strona 1/2
Setup your CHeKT Dealer Portal
Before getting started with CHeKT, you will need
access to a CHeKT dealer web portal. Access to this
portal allows you to install and manage
all your CHeKT devices. If you do not
have an account, please request a
dealer account by visiting:
www.chekt.com/registration
1. Connecting Power
Connect 12v of power to the power input on the terminal block included in the package. You can power the Bridge using the 12-DC
volt power output from alarm panel. Power status LED either red or green depending on the armed state, the unit is on. an is when
A standard 12vDC transformer can also power the Bridge.
Power Requirement 12v DC
Peak 800 power draw per unit mA
2. Wiring Input Triggers
The Bridge can support triggered events from cameras with edge-based analytics or a physical input trigger from a sensor or relay.
There are physical, digital input zones on the CKB312 Bridge. Each of these zones are programmed to operate independently12 ,
but all are a part of a common ground. you are wiring the Bridge with an existing alarm panel, the alarm zones connect to ese If th
inputs, as shown in below. The Bridge works with a device that can trip the alarm input of the Bridge. The alarm zones Figure 2 ny
each consist of an (I)nput, (G)round*.
If the Bridge shares a common ground with the
alarm panel, then (G) is not need Simply ed.
wire from one of Digital Inputs of the Bridge to
the zone terminal of the alarm panel, as shown
in Repeat this for each alarm zone Figure 2.
going through the Bridge. Whenever that
detector is triggered, the voltage changes on
this loop, signaling the Bridge to create a video
event for the camera assigned to that Digital
Input Zone. The alarm panel transmits the
alarm signal as programmed in your alarm
panel and simultaneously, the Bridge uploads
video to the CHeKT web portal.
If you are using a relay to trigger e of the on
Digital Input zone then use both the (I) and s,
(G) terminals.
If the Bridge is powered by an external source to the alarm panel, a common ground between the power supply, alarm panel and
bridge is required. *All ground terminals on the Bridge are common.
Using the CHeKT Dealer Portal, the installer must set the appropriate voltage ranges in the Bridge programming for both the alarm
and normal conditions. The 12 Digital Input LED lights on the Bridge are red when the Digital Input is in larm and are o when “A ”
the input is . Each alarm panel “Normal ”
manufacturer has published values for normal and
alarm voltage. Once the wiring is complete,
technicians are advised to test the functionality of
each detector by activating both the Bridge and the
alarm panel.
What happens if CHeKT Bridge is powered o?
The alarm detection devices connected to the Bridge still function even if the Bridge is powered down; however, the Bridge will not
communicate alarm and video events.
Visual Verication Bridge Installation Guide
CKB312
Figure 2
Figure 1
Figure 3


Specyfikacje produktu

Marka: Optex
Kategoria: Niesklasyfikowane
Model: CKB-312

Potrzebujesz pomocy?

Jeśli potrzebujesz pomocy z Optex CKB-312, zadaj pytanie poniżej, a inni użytkownicy Ci odpowiedzą




Instrukcje Niesklasyfikowane Optex

Optex

Optex QXI-DT-X5 Instrukcja

21 Grudnia 2024
Optex

Optex WXI-R Instrukcja

6 Grudnia 2024
Optex

Optex VXS-AM Instrukcja

6 Grudnia 2024
Optex

Optex FTN-AM Instrukcja

6 Grudnia 2024
Optex

Optex AP2-20N Instrukcja

9 Października 2024
Optex

Optex CW-G2 Instrukcja

7 Października 2024
Optex

Optex WXS-RDAM Instrukcja

5 Października 2024
Optex

Optex OAM-DUAL T Instrukcja

5 Października 2024

Instrukcje Niesklasyfikowane

Najnowsze instrukcje dla Niesklasyfikowane

SmallRig

SmallRig VB99 SE Instrukcja

29 Stycznia 2025
QSC

QSC TSC-8 Instrukcja

29 Stycznia 2025
XTRARM

XTRARM XTR-FS5130 Instrukcja

29 Stycznia 2025
Sunding

Sunding SD-581G Instrukcja

29 Stycznia 2025
XTRARM

XTRARM XTR-FS5070 Instrukcja

29 Stycznia 2025
XTRARM

XTRARM XTR-FS2010 Instrukcja

29 Stycznia 2025
OSEE

OSEE TX402 Instrukcja

29 Stycznia 2025